Samples
Samples don't have their own screen. You track them through the rest of the workflow:
- Move a supplier to the Sampling stage on the Suppliers tab.
- Record Sample cost and Sample lead on their quote.
- The Plan tab includes sample steps, such as requesting samples from your top two suppliers and checking them against your spec.
- Once you place an order, Golden sample approval and PP (pre-production) sample are milestones on it.
- To get samples from several factories checked and shipped together, book Sample consolidation.
Create an order
Orders are on the Builder plan and up.
- Open the project's Orders tab, or click Create order on a quote.
- Choose the supplier. If you pick Start from quote, the terms are filled in for you.
- Enter Quantity (units), Unit price, Tooling / molds, Incoterm and Payment terms.
- Add Sample lead time (days) and Production lead time (days). Optionally, set a Target ship date (ETD) to plan backwards from it, and choose a Shipping mode.
- Check the Schedule preview and create the order. It gets a PO number.
All your orders are also listed in Orders & QC in the sidebar.
Payment terms
- Type your terms as you would write them, for example 30/70, T/T 30/70, 50/50, 100% T/T, against B/L copy, on delivery, or net 30.
- The form shows how it understood them, as deposit and balance amounts.
- If it can't read your terms, it uses 30/70 and tells you so.
Milestones
Every order gets this schedule:
- Deposit payment
- Golden sample approval
- PP (pre-production) sample
- Materials in
- Production start
- DUPRO inspection
- Production complete
- PSI inspection
- Balance payment
- Booking & ship (ETD)
- Arrival & customs
- Delivered
- Factory steps are scheduled around Chinese New Year and Golden Week.
- Mark milestones done as they happen, and click Add milestone for anything extra.
- The order page has sections for Production timeline, Payments, Shipping, Documents and Quality control.
Plan an inspection (AQL)
On the order's Quality control section, click Plan inspection. The defaults are:
- Type: PSI (pre-shipment)
- Lot size: your order quantity
- Inspection level: II (standard)
- AQL limits: critical 0, major 2.5, minor 4.0
- Standard: ANSI/ASQ Z1.4
We work out the sample size and the accept and reject numbers for each defect class.
- Other inspection types are pre-production check, DUPRO, container loading check, factory audit and lab test. Only pre-production, DUPRO, PSI and container loading use AQL sampling.
- Under Who inspects, choose My team, Supply Flywheel inspector or a third party such as QIMA or V-Trust.
- Add AI product-specific checks adds checks tailored to your product.
- Book a Supply Flywheel inspector sends a request to the on-the-ground team.
QC checklist
The checklist covers:
- Functional tests and reliability spot tests
- Cosmetic checks against the golden sample
- Safety and compliance markings
- Packaging and labeling
- Quantity, weight and dimensions
Each check is rated Critical, Major or Minor.
Record results
- Click Record results.
- Count the defects in each class, and mark each check Pass, Fail or N/A.
- The verdict is worked out for you:
- PASS: the lot passed inspection.
- FAIL: the milestone is marked blocked until it's resolved.
- Conditional acceptance (override): accept the goods anyway, on your own judgment.
Documents and e-signature
The project's Documents tab drafts the paperwork from your project data:
- China NNN agreement
- Purchase order (PO)
- QC specification
- Tooling / mold ownership
- Supply agreement
- Any other document you describe
Click Generate draft, edit the text, then Download PDF or Send for signature. You can share the signing links yourself or have them emailed to the signers. E-signature is on Builder and up, and each document sent counts toward your monthly e-signature limit.
Templates are a starting point, not legal advice.