On this page
One project covers one product, from brief to factory to shipment.
Start a project
- Click New sourcing project in the sidebar.
- Choose Type to chat with Mei, our scoping assistant, or Talk to speak and then fix any word.
- Choose Quick start (about 7 questions, around 3 minutes) or Deep dive (adds specs, stage and packaging, around 8 minutes).
- Click Start and tell Mei what you're building. One sentence is enough, or tap an example.
Talk uses your browser's dictation. If your browser doesn't support it, you type instead.
The project is created when you send your first message. Your plan sets how many projects can be active at once.
While you chat
- Progress goes through What, Details, Priorities and Review.
- The What we've captured panel shows every fact Mei has picked up. Confirm, Edit or Remove each one, or click Looks right for all of them.
- In Priorities, tap up to 3 things that matter most and drag them into order.
- At the end, Here's what we captured lets you Review brief, Go deeper or Keep chatting.
Attach files
Click the paperclip (Attach a sketch or file). A napkin sketch is fine.
- Accepted types: images (PNG, JPG, WebP, GIF), PDF, TXT, CSV, XLSX, Markdown, JSON, and CAD files (STEP, STL, IGES, DXF).
- Up to 15 MB per file.
- Your files show under Your files on the project Overview, where you can download them.
How we use each file:
- Images: we describe what's in them.
- PDFs: we read the text. Scanned PDFs with no text are kept but not read.
- Spreadsheets and text files: we read their contents.
- STEP files: we read the header.
- STL, IGES and DXF files: we store them but don't read them.
BOM (parts list)
- Upload your BOM as an XLSX or CSV file. We read it as input for the brief.
- The brief also has a What you'll source list, which breaks your product into Parts, Accessories and Packaging. Add or remove items, or click Re-suggest for a fresh list.
- Each part has Find suppliers, so you can search for a component supplier separately from your assembler.
Packaging
- Packaging questions are only in Deep dive, and only once you're past the prototype stage.
- Pre-production projects get a short set of questions.
- Mass-production projects get the full set: pack type, size, inserts, printing, labels, eco materials, drop test, master carton, pallet and Amazon FBA.
- You can attach a dieline, artwork or a packaging photo when Mei asks.
The sourcing brief
Open the Brief tab. The brief turns your answers into something factories understand. It has:
- Product, quantity, target price and timeline
- Countries, key specs and materials
- The certifications your target markets require
- Packaging
- Open questions: gaps factories will ask about, so you can fill them before you send RFQs
- The What you'll source parts list
Edit or regenerate it
- Click any field to change it. Changes save automatically.
- Update answers reopens the chat with Mei.
- Regenerate rewrites the brief from your chat answers and files. This replaces any edits you made on the brief page.
- When the brief looks right, click Confirm & find suppliers to run your first supplier search.
The brief drives supplier search, match scores, RFQ drafts and the Compliance tab.
Archive a project
- Open the status menu in the project header and choose Archive project. Nothing is deleted.
- Archived projects don't count toward your active-project limit.
- To restore a project, change its status back. If you're at your limit, you'll need to archive another project or upgrade first.